Development phases and upcoming features.
We believe in radical transparency.
Below is the strict separation between what is live and what is currently in engineering, based on our January 2026 project logs.
Mobile Webapp (Priority P1)
Optimizing wallet connection and interface for mobile browsers.
Moved to V1.01 based on high user demand.
Day/Night Mode UI (Priority P0)
Implementing user-requested interface themes for better accessibility.
V3 Liquidity Expansion
We are actively researching feasible calculation methods for V3 Pool APRs.
We are coordinating with Base/Aerodrome to solve data availability issues.
The blocker is precise yield estimation for concentrated positions.
DCA & TWAP
Engineering is finalizing the “Pure Engineering” control modules.
This covers Dollar-Cost Averaging and Time-Weighted Average Price orders.
Advanced Token Search (Priority P1)
Upgrading search to support multi-token queries.
Email Subscriptions (Priority P2)
Adding direct email delivery for investment reports and alerts.
Bribe Optimization Engine
Advanced analysis of “Under-bribed” gauges to maximize voting efficiency.
Base App Integration
Native notification capabilities within the Base App.
Points Configuration
Enhanced customization for the XP/Rewards system.
Last updated 1 month ago